A.10 PARTICLE BOARD LINE No I ( PATANCHERU, IDA phase II )
Location
PATANCHERU, IDA phase II
CAPACITY
110 Cu.mtr/day
MAIN PLANT & EQUIPMENT
CHIP PREPARATION, DRYING & REFINING LINE
A.11 Drum Flaker
Bezner make(German)
Capacity
4.0 tons/hr atro
A.12 Tubular Bundle Dryers 2 nos,
Pondorff make,German
Water evaporation capacity
2400 kg/hr
A.13 Air Classifier 3 stage type,
Keller make,German
A.14 Rotary screen -- 4 fraction
Bezner make
A.15 PSK Mill
Pallman make
GLUING AND FORMING LINE
A.21 Glue Blenders, Qty: 2 nos
Swizz make
A.22 Mechanical Formers Qty : 3nos
Swizz make
2nos for face and 1 for core.
A.23 Forming line with double decker transport plate system.
A.24 LOADER & BOARD PUSHER
Kontra,German make
A.25 HYDRAULIC PRESS, Simultaneous closing,
Dieffenbacher,German make
Finished board size
3650X1830mm
No. of Openings
4 nos
Total Hydraulics incl Accumulators and HP Pumps
A.26 UNLOADER
FINISHING LINE
A.31 SANDING MACHINE Steinaman make
No. of Heads
4 heads
Working width
1900 mm
Dust collector
1 set
A.32 TRIM & CUT TO SIZE SAW
Steinamann make
1no
Local make
1no
LAMINATION LINE
A.41 VITS TREATER with double pass Impregnation having Infra red heaters in 1st pass
And 2 zone oven in 2nd pass and equipped with web aligner,haul off
Rolls and cutter assembly.
Working width
1900mm
A.42 SHORT CYCLE HYDRAULIC PRESS
Make
Siempelkamp,Germany
Board Sizes
2750X1830 and 2440X1830
Type
Up stroking
Loader
Tray belt
Unloader
Vacuum cup extractor
Raw board handling
Automatic
Papre handling
Mannual
A.43 SHORT CYCLE PRESS II
Make
chinese
Board Sizes
1820X1220 and 1830X1920
Type
Down stroking
Loader
Tray belt type
Unloader
Vacuum type
board & Paper handling
Mannual
AUXILLARY EQUIPMENT
A.51 Steam Boiler I
Capacity
6.0 tons/hr at 17 bar pressure
Make
Lambian,Austria
Fuel
Wood chips and sander dust
A.52 Steam boiler II
Make
Indian,Nestler
Capacity
5.0tons/hr at 15 bar pressure
Fuel
Coal or wood
A.53 Air compressors
Qty
4 nos
Make
Kirloskar
Capacity
2cbm/min each
A.54 Air conditioning Compressor plant
Capacity
15 TR
Make
Kirloskar
A.55 Cooling tower and Water Pumps
::This plant was originally set up in 1980 and undergone modernization and expansion
In 1995 and there after main equipment reconditioned in 2008.Finally the plant
Stopped working in 2011.